2021 Tri-State Generation & Transmission Assn, Lloyd Sisson-Keota 115 kV transmission line (CO). Inspection: New construction of 22 miles of 115 kV wood and steel structures.
2020-21 Tri-State Generation & Transmission Assn, Keota Materials Yard (CO). Inspection: Accept delivery of 230 kV T-Line materials and organize in Keota Yard.
2019-20 Tri-State Generation & Transmission Assn, Greenhouse-Colfer 230 kV (CO). Inspection: 10 miles of new double circuit 230 kV T-line.
2019-20 Black Hills Energy, Cheyenne Distribution (WY). Inspection: Wreck out and replacement of 25000 feet of 15kV underground cable for 1 phase and 3 phase services.
2019 Tri-State Generation & Transmission Assn, Iron Creek Tap (WY). Inspection: new 115 kV t-line plus tap into substation
2018-2019 Tri-State Generation & Transmission Assn, Montrose-Maverick 230 kV Transmission line (CO). Inspection: Install OPGW.
2018 Tri-State Generation & Transmission Assn, Nucla-Montrose 230 kV H-structure transmission line and OPGW (CO). Inspection: replace existing transmission line with new 230 kV wood H-structures.
2017-18 Western Area Power Administration, Granby Pumping Plant-Windy Gap 138 KV Rebuild & Substation (CO). Inspection: Remove 14 miles of existing 69 kV wood pole & build 12 miles of new 138 kV double circuit t-line steel structures. Granby Pump Plant 138 kV substation improvement.
2017 Western Area Power Administration, Beaver Creek Sterling OPGW (CO). Inspection: remove OGW, install OPGW: 35.9 miles Beaver Creek-Sterling (CO); 1.1 miles Erie-Terry Street (CO); 12.7 miles Ault-Weld (CO); 2.2 miles Cheyenne-Snowy Range (WY).
2017 Western Area Power Administration, Goshen-Torrington Rebuild (WY). Inspection: finish new Goshen Substation; Goshen-Torrington line upgrade from 69 kV to 115 kV insulators, replace 14 wood poles & reroute line to Torrington Sub. Medicine Bow Line Tap Replacement.
2017 Tri-State Generation & Transmission, Cahone-Maverick 230 kV (CO). Inspection: maintenance of 15 miles of 230 kV T-Line brush & tree removal.
2017 Tri-State Generation & Transmission, Montrose-Nucla 115 kV (CO). Inspection: 40 miles of right of way. Removal of trees/brush & build and modify right of way access roads and steel structure pads.
2017 Tri-State Generation & Transmission, Laguna Switch Substation De-commissioning (NM). Inspection: removal of existing 115 kV substation buildings, foundations & equipment.
2016 Tri-State Generation & Transmission, Alta Luna Tap (NM). Inspection: Rebuild & add 115 kV Tap.
2015-16 Tri-State Generation & Transmission, Burlington-Wray (CO). Inspection: New 72 mile 230 kV transmission line and fiber optic.
2016 Tri-State Generation and Transmission, Springer-Black Lake (NM). Inspection: Upgrade and new fiber optic of 30 miles of 115 kV transmission line.
2015 Tri-State Generation & Transmission, Big Sandy-Limon (CO). Inspection: Six miles of fiber optic and 230 kV transmission upgrade.
2015 Tri-State Generation & Transmission, Sheridan Hill Tap (CO). Inspection: New 115 kV transmission re-route.
2014 Tri-State Generation & Transmission, Buffalo Head-Grieves (WY). Inspection: New 4 miles of 230 kV line.
|